Measure the last mile
Check the access route, delivery point and any transport envelope. Confirm deployed and shipping dimensions for the proposed configuration.
RFQ checklist / scope & cost
Put each offer on the same footing: the same usable space, finish level, destination and included work. Then compare the building method and the responsibilities that travel with it.
Get Supplier Quotes
Before the quotation comparison
Check the access route, delivery point and any transport envelope. Confirm deployed and shipping dimensions for the proposed configuration.
Identify unloading, crane lift plan, assembly crew, weather protection and the foundation interface. Ask which party carries each responsibility.
Compare modular office building floor plans against occupancy, circulation, sanitary needs and service access. Similar floor area can hide a different room mix.
For modular office building delivery time, distinguish drawing approval, production, dispatch, freight and site readiness. Dates require supplier and project confirmation.
Keep the trade-offs in view
| Decision | One option | The alternative to examine |
|---|---|---|
| Format & site work | ||
| Volumetric or panelized | Finished modules can move more work off site. Confirm transport envelope, lifting access and foundation connections. | Panelized elements may pack more compactly. Identify assembly, joints, finishes and temporary weather protection left to the destination team. |
| Standard or project-specific | A published layout can make comparison easier when the occupancy and options fit. | Different room use, openings, local design criteria or service interfaces may need drawings and further engineering review. Ask what changes and who reviews it. |
| Budget & responsibility | ||
| Shell or wider scope | A shell or kit may leave foundations, finishes, services and installation with the buyer. | A wider or installed offer must name the additional work and exclusions. The word turnkey alone does not define permits, utilities or site civil work. |
| Cost per floor area | Modular building cost per square foot can help organize an early budget question. | Check the same usable/gross area basis, currency, quantity, finish level, freight, tax and installation scope before comparing figures. Use each supplier’s stated area and delivery basis to build a comparable total. |
| Supplier preference | A budget preference may prioritize a standard layout, simpler finishes or buyer-managed site work. | A premium preference may prioritize finishes, customization or a wider service scope. Ask which differences are actually offered; a preference is not a verified-supplier tier. |
Documents before decisions
Ask for the proposed layout and module dimensions, primary frame/material schedule, steel grade and coating where relevant, wall/roof build-up and utility interfaces. Have the responsible project parties supply or review the wind, snow, seismic, thermal and fire criteria for the destination and proposed configuration.
Check the supplier, production location where relevant, configuration and document scope. A material certificate or another building’s test report does not establish approval for the offered building; identify the project-specific engineering or testing still needed.
Issue the same dated brief to each supplier. Keep a row for every inclusion, exclusion and open assumption. Request revisions when a supplier changes quantity, layout, destination or scope, and compare the revised offers on that common basis.
Quantity, dimensions, preferred system, budget, delivery timing and local review requirements can be developed after contact. Start with a useful description of the space and your contact details; leave unknowns clearly marked.
One common brief
Tell us the intended use and the decisions still open. We help organize a common scope so supplier differences are easier to see.