| Building & delivery |
|---|
| Shell / building supply | Frame or module structure, walls, roof, openings and named finishes. List service fittings and furniture separately. |
| Freight & delivery | Packing, shipment assumptions, destination, taxes or duties, delivery point and unloading responsibility. Do not silently compare different trade terms. |
| Site & installation | Foundation interface, lifting, assembly, weather protection, utility connections and commissioning, where required. |
| Documents & choices |
|---|
| Design basis | Project location, intended occupancy and the local design criteria. Confirm who supplies or reviews the engineering and approval documents. |
| Envelope & finishes | Wall and roof build-up, material schedule, steel grade/coating where relevant, and the thermal or fire-performance documents needed for the intended use. |
| Commercial options | Minimum order quantity, drawing/sample stages, proposed production and shipping timing, payment terms and quote validity. These are request-specific, not fixed site promises. |